The View Hospital (Doha, Qatar)

PROJECT REQUIREMENTS:

The customer requested Fuel System fo Back up generators and Fuel Monitoring and Leak Detection system for various substations.

OUR SOLUTION:

The complete installation consists of one fuel monitoring panel handling 3 duplex fuel supply systems to 6 gensets, controlling the automatic refill and reporting alarms to central BMS.

Each genset day tank is automatically refilled whenever level drops below 50% via a solenoid valve connected to the fuel monitoring panel.

All alerts (leak, low level, etc) are easily monitored at the CAG central fuel monitoring panel as well, according to the specific cause an effect protocol required.

    EQUIPMENT:

    • Main tank control: EDM-40 probe with remote display at fill point
    • Leak detection: LMW for drip trays, sumps and interstitial chamber detection
    • Level switches SMMR with Solenoid valves: control the filling process
    • CAG fuel monitoring panel control system with all tanks level monitoring and dry relay BMS outputs.
    • Pressure and Flow meter and rest of fuel handling equipment

    Want to know more details about this project?

    If you belong to the engineering, construction or project consultancy sector and you want to know more information about this project and many others about hospitals, airports, data centers, shopping centers, etc… you can download our project dossier here.






      Diesel supply for Backup Critical Facilities

      We are specialized in the design and manufacture automatic fuel, pumping systems for critical backup installations, and industrial and commercial heat production.

      We develop engineering bespoke solutions for automatic supply of boilers and power generation plants in:

      • Hospitals
      • Data centers
      • Airports
      • Office buildings
      • Residential buildings
      • Malls

       

      Another projects