PROJECT REQUIREMENTS:
The main objective of the system is to carry out effective monitoring and control over the different elements of the installation and to carry out their communication to a global BMS management system.
Solution adopted by INPRO
The installation is composed of a double pump unit as well and four electric generators with their corresponding daily tanks with the safety devices and their return single pump units.
EQUIPMENT
- Tank control: EDM-40 probe with display
- Leak detection: DDP-25 interstitial chamber detector
- Pump system: 2 x fuel pump GP-3200 GET
- 4 x overflow return pumps
- Solenoid & By-pass valves
- CAG+ control system & Pump control cabinet
- Alarm KIT
- Collector tray with leak detector
- Pressure and Level switches SMMR