by Liz Dimely | Apr 16, 2024
Project Requirements: The project consisted of automating and controlling the Diesel supply needs of 4 Emergency Power Generator Units from two main tanks, crosslinked in N+N Tier IV redundancy system. Equinix established the first neutral interconnection hub in Oman,...
by Liz Dimely | Apr 16, 2024
Project Requirements: The customer requested a TIER IV redundant fuel supply to gensets, with automatic protocols for:- Storage tanks filling- Storage Tank suction protocol and refill of Day Tanks- Leak detection at Storage tank + several leak detection points Metro...
by inproadmin | Feb 22, 2022
PROJECT REQUIREMENTS: The following project was a big challenge, not only in terms of the height at which the systems were located, but also in terms of the project requirements for fire and overflow control in such a singular building, a unique facility. Solution...
by inproadmin | Feb 22, 2022
PROJECT REQUIREMENTS: The objective was to control the fuel level storage remotely. Solution adopted by INPRO The Inpro Gateway allows the user to easily monitor the storage tanks fuel levels by means of sending the analogic output to the platform. The digital outputs...
by inproadmin | Feb 22, 2022
PROJECT REQUIREMENTS: The purpose of the system is to control the main tank, capacity and different alarms, as well as the filling of the daily tanks and overflow safety. Using submersible pumps in the main tanks. Solution adopted by INPRO The complete installation...